USGI M14 EBR Trigger Shoe Installation Instructions:

Test fit the shoe on your trigger.
Clean the trigger, the interior of the shoe, both set screws and the threaded holes with rubbing alcohol.
Apply a bead of Blue Loctite to the inside cavity of the shoe using the Loctite as bedding material.
Add Loctite to one screw and thread it shallow into the shoe, now slip the shoe onto the trigger.
Tighten the one screw enough to hold the shoe in place, but allow for adjustment if needed.
Insert the second screw treated with Loctite and tighten both.
Please allow a full 24 hours for the Loctite to set-up.

We use 3-48×3/32 cup point alloy steel set screws, a spare is included.

Short video

 

Blackfeather "RS" Facebook.com/BlackfeatherRS The History and Development of the M14 EBR Facebook.com/M14EBR.US